Engine overhaul

An engine comes apart — and goes back together fully documented

An overhaul is not a repair based on suspicion. We dismantle the engine completely, measure every critical part and put in writing what will be machined, replaced or fabricated. Only then does the work begin.

What you hold at the end: an engine that runs the way it should again — and the paperwork that proves how.

Process

The overhaul step by step

01

Dismantling & inspection

Removal or acceptance, complete disassembly, visual inspection of all assemblies. Duration: a few days.

02

Measuring & documentation

All dimensions recorded and documented: bore, shaft, bearing clearances, valve train. You receive the assessment before anything costs money.

03

Machining

Honing, boring, surfacing, valve seats and guides — what needs to be done, and only that.

04

Sourcing or making parts

What is available is sourced. What is not available, we make — right down to the cast bearing from our own foundry.

05

Assembly & acceptance

Assembly with documented torques and clearances, running in, test-bench run where possible, handover with documentation.

Duration

Realistic timeframes

PhaseGuideline
Dismantling, assessment, quote1–2 weeks
Machining and parts sourcing3–8 weeks
Assembly, running in, acceptance1–2 weeks

What matters is the condition and the parts situation. An engine with good stock parts can be done in six weeks; an engine that needs bearings cast or parts fabricated takes longer. We tell you beforehand, not during.

Handover

What you receive on paper

With us, handover includes more than the key:

DocumentContents
Assessment reportdimensions and condition before the work
Work summarymachining carried out and spare parts fitted
Measurement logbearing clearances, torques, settings
Running-in / test-bench logwhere applicable

These records belong to your vehicle's history — and, in a sale, to its value.

Request an overhaul